Heuristical job allocation in a flexible manufacturing system
- 1 February 1986
- journal article
- Published by Springer Science and Business Media LLC in The International Journal of Advanced Manufacturing Technology
- Vol. 1 (2), 69-90
- https://doi.org/10.1007/bf02601447
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- An algorithm for the computer control of production in a flexible manufacturing systemPublished by Institute of Electrical and Electronics Engineers (IEEE) ,1981
- Capacity Planning with a Stochastic Workflow ModelA I I E Transactions, 1981
- Models for Understanding Flexible Manufacturing SystemsA I I E Transactions, 1980
- Time-optimal control of parts-routing in a manufacturing system with failure-prone machinesPublished by Institute of Electrical and Electronics Engineers (IEEE) ,1980
- A practical approach to production schedulingInternational Journal of Production Research, 1979
- Computer-Managed Parts ManufactureScientific American, 1975
- Heuristic Algorithms for Multistage Flowshop Scheduling ProblemA I I E Transactions, 1972
- A practical control system for optimizing production schedulesInternational Journal of Production Research, 1971
- Heuristics in Job Shop SchedulingManagement Science, 1966
- Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near OptimumJournal of the Operational Research Society, 1965