A comparative study on cost and life‐cycle analysis for 100 MW very large‐scale PV (VLS‐PV) systems in deserts using m‐Si, a‐Si, CdTe, and CIS modules
- 15 May 2007
- journal article
- research article
- Published by Wiley in Progress In Photovoltaics
- Vol. 16 (1), 17-30
- https://doi.org/10.1002/pip.770
Abstract
No abstract availableKeywords
This publication has 4 references indexed in Scilit:
- Energy payback and life‐cycle CO2 emissions of the BOS in an optimized 3·5 MW PV installationProgress In Photovoltaics, 2005
- Life cycle assessment of crystalline photovoltaics in the Swiss ecoinvent databaseProgress In Photovoltaics, 2005
- A preliminary study on potential for very large-scale photovoltaic power generation (VLS-PV) system in the Gobi desert from economic and environmental viewpointsSolar Energy Materials and Solar Cells, 2003
- Energy pay-back time and life-cycle CO2 emission of residential PV power system with silicon PV moduleProgress In Photovoltaics, 1998