A multi-objective PSO for job-shop scheduling problems
- 4 July 2009
- journal article
- Published by Elsevier BV in Expert Systems with Applications
- Vol. 37 (2), 1065-1070
- https://doi.org/10.1016/j.eswa.2009.06.041
Abstract
No abstract availableKeywords
This publication has 25 references indexed in Scilit:
- A hybrid particle swarm optimization for job shop scheduling problemComputers & Industrial Engineering, 2006
- A hybrid genetic algorithm for the job shop scheduling problemEuropean Journal of Operational Research, 2005
- Particle swarm optimization-based schemes for resource-constrained project schedulingAutomation in Construction, 2005
- An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problemsComputers & Industrial Engineering, 2005
- Parameter Settings and Representations in Pareto-Based Optimization for Job Shop SchedulingCybernetics and Systems, 2002
- A multiobjective genetic algorithm for job shop schedulingProduction Planning & Control, 2001
- A tabu search method guided by shifting bottleneck for the job shop scheduling problemEuropean Journal of Operational Research, 2000
- A genetic algorithm based procedure for more realistic job shop scheduling problemsInternational Journal of Production Research, 1998
- Job-shop scheduling: Computational study of local search and large-step optimization methodsEuropean Journal of Operational Research, 1995
- OR-Library: Distributing Test Problems by Electronic MailJournal of the Operational Research Society, 1990