Abstract
The author argues that although waste occurs from many causes, it is sometimes beyond the influence of the building firm and that material control starts at design stage, as the final design should allow for the effective handling and convenient manoeuvering of materials and components of preferred sizes during construction.

This publication has 1 reference indexed in Scilit: