Comparing the Costs of Intermittent and Dispatchable Electricity Generating Technologies
Top Cited Papers
- 1 May 2011
- journal article
- Published by American Economic Association in American Economic Review
- Vol. 101 (3), 238-241
- https://doi.org/10.1257/aer.101.3.238
Abstract
Economic evaluations of alternative electric generating technologies typically rely on comparisons between their expected “levelized cost” per MWh supplied. I demonstrate that this metric is inappropriate for comparing intermittent generating technologies like wind and solar with dispatchable generating technologies like nuclear, gas combined cycle, and coal. It overvalues intermittent generating technologies compared to dispatchable base load generating technologies. It also likely overvalues wind generating technologies compared to solar generating technologies. Integrating differences in production profiles, the associated variations in wholesale market prices of electricity, and life-cycle costs associated with different generating technologies is necessary to provide meaningful comparisons between them.Keywords
All Related Versions
This publication has 1 reference indexed in Scilit:
- Capacity payments in imperfect electricity markets: Need and designUtilities Policy, 2008