Stress Changes and Deformation Monitoring of Longwall Coal Pillars Located in Weak Ground
Top Cited Papers
- 8 April 2016
- journal article
- research article
- Published by Springer Nature in Rock Mechanics and Rock Engineering
- Vol. 49 (8), 3293-3305
- https://doi.org/10.1007/s00603-016-0970-8
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (51404168)
- Fundamental Research Funds for the Central Universities (106112015CDJXY240005)
This publication has 18 references indexed in Scilit:
- Numerical Investigation of the Dynamic Mechanical State of a Coal Pillar During Longwall Mining Panel ExtractionRock Mechanics and Rock Engineering, 2012
- Numerical modelling of longwall mining and stability analysis of the gates in a coal mineInternational Journal of Rock Mechanics and Mining Sciences, 2012
- Assessment of mining induced stress development over coal pillars during depillaringInternational Journal of Rock Mechanics and Mining Sciences, 2011
- The Effect of Specimen Size on Strength and Other Properties in Laboratory Testing of Rock and Rock-Like Cementitious Brittle MaterialsRock Mechanics and Rock Engineering, 2011
- Numerical Study of Failure Mechanism of Serial and Parallel Rock PillarsRock Mechanics and Rock Engineering, 2010
- A Comparative Analysis of Pillar Design Methods and its Application to Marble MinesRock Mechanics and Rock Engineering, 2006
- Numerical estimation of pillar strength in coal minesInternational Journal of Rock Mechanics and Mining Sciences, 2001
- Yield pillars for stress control in longwall mines ? case studyGeotechnical and Geological Engineering, 1990
- A review of coal pillar strength formulasRock Mechanics and Rock Engineering, 1977
- The significance of in situ tests on large rock specimensInternational Journal of Rock Mechanics and Mining Sciences, 1975