Production rate optimization in a two-stage system with finite intermediate storage
- 31 December 1984
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 18 (3), 369-376
- https://doi.org/10.1016/0377-2217(84)90159-0
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- On the Optimal Allocation of Work in Symmetrically Unbalanced Production Line Systems with Variable Operation TimesManagement Science, 1979
- The Reversibility Property of Production LinesManagement Science, 1979
- The effect of inequality of interstage buffer capacities and operation time variability on the efficiency of production line systemsInternational Journal of Production Research, 1979
- The efficiency of balanced and unbalanced production linesInternational Journal of Production Research, 1979
- Properties of duality in tandem queueing systemsAnnals of the Institute of Statistical Mathematics, 1975
- Two-Stage Production Systems with Intermediate StorageA I I E Transactions, 1975
- Queue length for the Ek/G/1 queue by finite waiting roomAdvances in Applied Probability, 1975
- On the mean production rate of a two-stage production system of the tandem typeInternational Journal of Production Research, 1975
- The production rate of a series of work stations with variable service times∗International Journal of Production Research, 1973
- Sequential Arrays of Waiting LinesOperations Research, 1956