During the past several years there have been significant scientific and technological advances related to the tokamak magnetic confinement scheme. These are summarized in the context of a recent tokamak reactor design study which emphasizes reduced size, higher power density, and enhanced plant reliability and maintainability relative to earlier tokamak reactor design studies. The direct plant cost of the proposed reactor is estimated to be in the range $1000 to $1500 per electrical kilowatt. A three-phase strategy for demonstrating tokamak fusion power generation at a committed site is outlined. It is estimated that implementation of the three-phase program would require about 20 years and a total escalated expenditure $10 billion to $15 billion. The tokamak power plant described here is not viewed as definitive but rather as a point of departure in the development of a plan to demonstrate tokamak power generation.