Minimizing tardiness on a single processor with sequence-dependent setup times: a simulated annealing approach
- 1 December 1997
- Vol. 25 (6), 619-634
- https://doi.org/10.1016/s0305-0483(97)00024-8
Abstract
No abstract availableKeywords
This publication has 19 references indexed in Scilit:
- Multicriteria facility layout problem: An integrated approachEuropean Journal of Operational Research, 1993
- Single Machine Tardiness Sequencing HeuristicsIIE Transactions, 1991
- Dynamic programming and decomposition approaches for the single machine total tardiness problemEuropean Journal of Operational Research, 1987
- A MILP model for then-job,M-stage flowshop with sequence dependent set-up timesInternational Journal of Production Research, 1986
- Optimization by Simulated AnnealingScience, 1983
- njobs andmmachines job-shop problems with sequence-dependent set-up timesInternational Journal of Production Research, 1982
- A state-of-the-art survey of dispatching rules for manufacturing job shop operationsInternational Journal of Production Research, 1982
- Sequence dependent set-up times and job sequencingInternational Journal of Production Research, 1977
- Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approachNaval Research Logistics Quarterly, 1974
- Review of sequencing researchNaval Research Logistics Quarterly, 1970