Modelling and Performance Evaluation of an Overhead Hoist Transport System in a 300 mm Fabrication Plant
- 1 July 2002
- journal article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 20 (2), 153-161
- https://doi.org/10.1007/s001700200137