A practical resource scheduling with OPF constraints
- 1 January 1996
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 11 (1), 254-259
- https://doi.org/10.1109/59.486103
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- Short-term generation scheduling with transmission and environmental constraints using an augmented Lagrangian relaxationIEEE Transactions on Power Systems, 1995
- Ramp-rate limits in unit commitment and economic dispatch incorporating rotor fatigue effectIEEE Transactions on Power Systems, 1994
- Effects of ramp-rate limits on unit commitment and economic dispatchIEEE Transactions on Power Systems, 1993
- Daily generation scheduling optimization with transmission constraints: a new class of algorithmsIEEE Transactions on Power Systems, 1992
- An innovative approach to generations scheduling in large-scale hydro-thermal power systems with fuel constrained unitsIEEE Transactions on Power Systems, 1990
- Implementation of a Lagrangian relaxation based unit commitment problemIEEE Transactions on Power Systems, 1989
- Towards a more rigorous and practical unit commitment by Lagrangian relaxationIEEE Transactions on Power Systems, 1988
- A New Method for Unit Commitment at Electricite De FranceIEEE Transactions on Power Apparatus and Systems, 1983
- IEEE Reliability Test SystemIEEE Transactions on Power Apparatus and Systems, 1979