CONCURRENT SCHEDULES OF REINFORCEMENT: EFFECTS OF GRADUAL AND ABRUPT INCREASES IN CHANGEOVER DELAY1

Abstract
Pigeons' pecks were maintained on concurrent variable-interval 1-min variable-interval 3-min schedules of reinforcement, with a changeover delay of 2 sec. When changeover delay was increased successively to 5.0, 7.5, and 12.5 sec (Exp. I) the actual relative rate of reinforcement for the variable-interval 3-min key decreased progressively for two birds, abruptly for two other birds, and the subjects devoted proportionately less of their time and responding to that key. However, the relative performance measures (relative time and relative responding) approximated the actual relative rate of reinforcement, with a maximum discrepancy of 11%, over all changeover delay values investigated. Experiment II attempted to lengthen response-run durations on the variable-interval 3-min key so that they were long enough to meet the changeover delay requirement at each new changeover delay value, by progressively increasing the changeover delay by 0.5-sec increments. With this procedure the actual relative rate of reinforcement approximated more closely the scheduled relative rate as changeover delay increased. As in Exp. I, relative performance measures approximated the actual relative reinforcement rate (maximum discrepancy 17%).

This publication has 8 references indexed in Scilit: