Uncertainty of Predictions of Embankment Dam Breach Parameters
Top Cited Papers
- 1 May 2004
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Hydraulic Engineering
- Vol. 130 (5), 389-397
- https://doi.org/10.1061/(asce)0733-9429(2004)130:5(389)
Abstract
Risk assessment studies considering the failure of embankment dams often require the prediction of basic geometric and temporal parameters of a breach, or the estimation of peak breach outflows. Many of the relations most commonly used to make these predictions were developed from statistical analyses of data collected from historic dam failures. The prediction uncertainties of these methods are widely recognized to be very large, but have never been specifically quantified. This paper presents an analysis of the uncertainty of many of these breach parameter and peak flow prediction methods. Application of the methods and the uncertainty analysis are illustrated through a case study of a risk assessment recently performed by the Bureau of Reclamation for a large embankment dam in North Dakota.Keywords
This publication has 7 references indexed in Scilit:
- Methods for predicting peak discharge of floods caused by failure of natural and constructed earthen damsWater Resources Research, 1997
- HEADCUT ADVANCE PREDICTION FOR EARTH SPILLWAYSTransactions of the ASAE, 1997
- Peak Outflow from Breached Embankment DamJournal of Water Resources Planning and Management, 1995
- The maximum discharge of outburst floods caused by the breaching of man-made and natural damsCanadian Geotechnical Journal, 1986
- Floods from dam failuresPublished by US Geological Survey ,1985
- Breaching Charateristics of Dam FailuresJournal of Hydraulic Engineering, 1984
- Sensitivity of outflow peaks and flood stages to the selection of dam breach parameters and simulation modelsJournal of Hydrology, 1984