Production Scheduling of Flexible Manufacturing Systems
- 1 January 1982
- journal article
- Published by Elsevier in CIRP Annals
- Vol. 31 (1), 319-322
- https://doi.org/10.1016/s0007-8506(07)63320-4
Abstract
No abstract availableKeywords
This publication has 3 references indexed in Scilit:
- Solution of Large-Scale Scheduling Problems for Job-Shop Type Machining Systems with Alternative Machine ToolsCIRP Annals, 1980
- Operational control of item flow in versatile manufacturing systemsInternational Journal of Production Research, 1979
- A Survey of Scheduling RulesOperations Research, 1977