Can Britain bridge the productivity gap?
- 1 April 1994
- journal article
- Published by Elsevier in Long Range Planning
- Vol. 27 (2), 85-94
- https://doi.org/10.1016/0024-6301(94)90212-7
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Capital Stocks and Productivity in Industrial NationsNational Institute Economic Review, 1993
- Productivity Levels in British and German Manufacturing IndustryNational Institute Economic Review, 1992
- Manufacturing Productivity Levels in France and the United KingdomNational Institute Economic Review, 1990
- Labour Productivity in UK Manufacturing in the 1970s and in the 1980sNational Institute Economic Review, 1990
- The Economic Effects of Industrial Relations Legislation Since 1979National Institute Economic Review, 1990
- Comparative Levels of Labour Productivity in Dutch and British ManufacturingNational Institute Economic Review, 1990
- Productivity, Machinery and Skills: Clothing Manufacture in Britain and GermanyNational Institute Economic Review, 1989
- Water Notes Dry Up: The Impact of the Donovan Reform Proposals and Thatcherism At Work on Labour Productivity in British Manufacturing IndustryBritish Journal of Industrial Relations, 1989
- A Second Look At Productivity, Machinery and Skills in Britain and GermanyNational Institute Economic Review, 1987
- Productivity, Machinery and Skills in a Sample of British and German Manufacturing PlantsNational Institute Economic Review, 1985