Optimal Scheduling of Hydro-Thermal Power Systems

Abstract
The model studied is comprised of thermal and hydro plants as well as electrical and hydro networks. It incorporates such features as variable water heads and cascaded plants, taking into account time delays as well as spilling. The transmission network is described by electrical equations. The model also includes such constraints as bounds on the equipment ratings and operating conditions.

This publication has 7 references indexed in Scilit: