Development and Installation of 138 KV Cable Systems for Tests at EEI Waltz Mill Station: Cable 23
- 1 July 1972
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Apparatus and Systems
- Vol. PAS-91 (4), 1443-1447
- https://doi.org/10.1109/TPAS.1972.293277
Abstract
This paper covers the General Electric Company's development, testing and installation at the Waltz Mill Station of a 138 kV solid dielectric power cable and associated splice. The cable described is unique in the industry in that (1) it utilizes a new insulation with higher breakdown strength, (2) is the only cable at Waltz Mill to use a mineral filled cross- linked polyethylene, and (3) has its insulation shield intimately bonded to the insulation.Keywords
This publication has 2 references indexed in Scilit:
- Accelerated Aging Tests of 69-kV Cross-Linked Polyethylene Cable and JointsIEEE Transactions on Power Apparatus and Systems, 1969
- Determination of the Internal Discharge Resistance of Dielectric MaterialsIEEE Transactions on Electrical Insulation, 1968