Flexible manufacturing system (FMS) scheduling using filtered beam search
- 1 September 1990
- journal article
- Published by Springer Nature in Journal of Intelligent Manufacturing
- Vol. 1 (3), 165-183
- https://doi.org/10.1007/bf01572636
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- A bottleneck-based beam search for job scheduling in a flexible manufacturing systemInternational Journal of Production Research, 1989
- Aggregate scheduling of a flexible machining and assembly systemIEEE Transactions on Robotics and Automation, 1989
- The Single Machine Early/Tardy ProblemManagement Science, 1989
- Survey of scheduling research involving due date determination decisionsEuropean Journal of Operational Research, 1989
- Filtered beam search in scheduling†International Journal of Production Research, 1988
- An experimental investigation of FMS scheduling rules under uncertaintyJournal of Operations Management, 1987
- Experimental investigation of flexible manufacturing system scheduling decision rulesInternational Journal of Production Research, 1987
- A Rule-Based System to Schedule ProductionComputer, 1986
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing SystemsManagement Science, 1983
- Control and Decision Support in Automatic Manufacturing SystemsA I I E Transactions, 1980