Precast production scheduling using multi-objective genetic algorithms
- 1 July 2011
- journal article
- Published by Elsevier in Expert Systems with Applications
- Vol. 38 (7), 8293-8302
- https://doi.org/10.1016/j.eswa.2011.01.013
Abstract
No abstract availableKeywords
This publication has 31 references indexed in Scilit:
- Comparison between genetic algorithm and linear programming approach for real time operationJournal of Hydro-environment Research, 2008
- Multi-objective genetic algorithms: A way to improve the convergence rateEngineering Applications of Artificial Intelligence, 2006
- Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithmsInternational Journal of Production Research, 2005
- Flowshop scheduling model for bespoke precast concrete production planningConstruction Management and Economics, 2005
- Flow shop scheduling with earliness, tardiness, and intermediate inventory holding costsNaval Research Logistics (NRL), 2004
- Constraint Programming Approach to Precast Production SchedulingJournal of Construction Engineering and Management, 2002
- A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machinesComputers & Operations Research, 2002
- Minimizing makespan in a blocking flowshop using genetic algorithmsInternational Journal of Production Economics, 2001
- Optimal design of aquifer cleanup systems under uncertainty using a neural network and a genetic algorithmWater Resources Research, 1999
- A Heuristic Algorithm for the n Job, m Machine Sequencing ProblemManagement Science, 1970