A comparison of the performance of various project control methods using earned value management systems
- 1 April 2015
- journal article
- Published by Elsevier in Expert Systems with Applications
- Vol. 42 (6), 3159-3175
- https://doi.org/10.1016/j.eswa.2014.12.007
Abstract
No abstract availableThis publication has 36 references indexed in Scilit:
- Setting tolerance limits for statistical project control using earned value managementOmega, 2014
- Visualized EVM system for assessing project performanceAutomation in Construction, 2010
- Evolutionary fuzzy decision model for construction management using support vector machineExpert Systems with Applications, 2010
- Evolutionary support vector machine inference system for construction managementAutomation in Construction, 2009
- Developing activity duration specification limits for effective project controlEuropean Journal of Operational Research, 2006
- Earned Value Project Management Method and ExtensionsProject Management Journal, 2003
- RanGen: A Random Network Generator for Activity-on-the-Node NetworksJournal of Scheduling, 2003
- Timing control points via simulation for production systems under random disturbancesMathematics and Computers in Simulation, 2001
- On criticality and sensitivity in activity networksEuropean Journal of Operational Research, 2000
- Fitting Beta Distributions Based on Sample DataJournal of Construction Engineering and Management, 1994