Retrofitting a Geothermal Power Plant to Optimize Performance: A Case Study
- 1 December 1999
- journal article
- Published by ASME International in Journal of Energy Resources Technology
- Vol. 121 (4), 295-301
- https://doi.org/10.1115/1.2795996
Abstract
Performance evaluation of a 12.8-MW single-flash design geothermal power plant in Northern Nevada is conducted using actual plant operating data, and potential improvement sites are identified. The unused geothermal brine reinjected back to the ground is determined to represent about 50 percent of the energy and 40 percent of the exergy available in the reservoir. The first and second-law efficiencies of the plant are determined to be 6 percent and 22 percent, respectively. Optimizing the existing single-flash system is shown to increase the net power output by up to 4 percent. Some well-known geothermal power generation technologies including double-flash, binary, and combined flash/binary designs as alternative to the existing system are evaluated and their optimum operating conditions are determined. It is found that a double-flash design, a binary design, and a combined flash/binary design can increase the net power output by up to 31 percent, 35 percent, and 54 percent, respectively, at optimum operating conditions. An economic comparison of these designs appears to favor the combined flash/binary design, followed by the double-flash design.Keywords
This publication has 5 references indexed in Scilit:
- Incorporating a District Heating/Cooling System Into an Existing Geothermal Power PlantJournal of Energy Resources Technology, 1998
- Nature and technology of geothermal energy: A reviewRenewable and Sustainable Energy Reviews, 1997
- Binary-Flashing Geothermal Power PlantsJournal of Energy Resources Technology, 1993
- A flashing binary combined cycle for geothermal power generationEnergy, 1993
- Thermodynamic analysis of binary-fluid Rankine cycles for geothermal power plantsEnergy Conversion and Management, 1988