Performability-based fleet sizing in a material handling system
- 1 June 1998
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 14 (6), 441-449
- https://doi.org/10.1007/bf01304623
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- Performance measurement system designInternational Journal of Operations & Production Management, 1995
- Minimizing the fleet size with dependent time-window and single-track constraintsOperations Research Letters, 1993
- Estimation of number of AGVs for an FMS: an analytical modelInternational Journal of Production Research, 1993
- An economic model for determining AGV fleet sizeInternational Journal of Production Research, 1992
- Mathematical modeling of the AGVS capacity requirements planning problemEngineering Costs and Production Economics, 1991
- Design of an automated guided vehicle-based material handling system for a flexible manufacturing systemInternational Journal of Production Research, 1990
- An analytical method for configuring fixed-path, closed-loop material handling systems†International Journal of Production Research, 1990
- Simulation Study of an Automated Guided-vehicle System in a Yugoslav HospitalJournal of the Operational Research Society, 1990
- A simulation study of multiple-load-carrying automated guided vehicles in a flexible manufacturing systemInternational Journal of Production Research, 1988
- Design of Automatic Guided Vehicle SystemsA I I E Transactions, 1982