The effects of skewness and kurtosis of processing times in unpaced lines
- 22 October 1987
- journal article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 25 (10), 1483-1492
- https://doi.org/10.1080/00207548708919927
Abstract
No abstract availableKeywords
This publication has 19 references indexed in Scilit:
- A Directly-Coupled Two-Stage Unpaced LineIIE Transactions, 1986
- A decision support system for the design of unpaced production linesInternational Journal of Production Research, 1986
- The production rate of a two-stage system with stochastic processing timesInternational Journal of Production Research, 1986
- Some problems with transient phenomena when simulating unpaced linesJournal of Operations Management, 1981
- A Realistic Approach for Modeling Stochastic Lead Time DistributionsA I I E Transactions, 1979
- The effect of inequality of interstage buffer capacities and operation time variability on the efficiency of production line systemsInternational Journal of Production Research, 1979
- The location of variable work stations and the performance of production flow linesInternational Journal of Production Research, 1976
- The effects of performance time variance on a balanced, four-station manual assembly lineInternational Journal of Production Research, 1973
- WORK-TIME DISTRIBUTIONSInternational Journal of Production Research, 1963
- A DISTRIBUTION-FREE k-SAMPLE TEST AGAINST ORDERED ALTERNATIVESBiometrika, 1954