This study considers multistage production systems where defective units can be reworked repeatedly at every stage. Production, as well as rework, is in lots requiring set-up and variable production costs, and orders need to be filled in their entirety. The yield of each stage is uncertain, so several production runs may need to be attempted until the quantity of finished products is sufficient. The trade-off at each stage is between using small lots, possibly necessitating repeated rework set-ups and large lots, which may result in costly overproduction. Multistage manufacturing facilities with rework capabilities are quite common in practice, but their optimal operation when orders have to be met in full has been virtually unexplored. We show that a multistage system where only one of the stages requires a setup (a "single-bottleneck system") can be reduced to a single-stage system. Moreover, if it is possible to arrange the operations in any order, we prove that it is best to make the "bottleneck" the first stage of the system. We also develop recursive algorithms for solving two- and three-stage systems, where all stages require set-ups, optimally. Generalizations to systems where rework yields and costs differ from those of initial processing are also discussed.multistage production systems, random yields, rigid demand, reworkKeywords
This publication has 15 references indexed in Scilit:
- Stochastic analysis of a single server retrial queue with general retrial timesNaval Research Logistics (NRL), 1999
- Control Limits for Multi-stage Manufacturing Processes with Binomial Yield (Single and Multiple Production Runs)Journal of the Operational Research Society, 1996
- Single-machine lot-sizing with uniform yields and rigid demands: robustness of the optimal solutionIIE Transactions, 1995
- Single bottleneck systems with proportional expected yields and rigid demandEuropean Journal of Operational Research, 1995
- Production to order on a two machine line with random yields and rigid demandEuropean Journal of Operational Research, 1995
- Multistage production systems with random yield: heuristics and optimalityInternational Journal of Production Research, 1994
- Multiple lotsizing with random common-cause yield and rigid demandOperations Research Letters, 1990
- A Heuristic for Multiple Lot Sizing For an Order Under Variable YieldIIE Transactions, 1986
- Optimal reject allowance with constant marginal production efficiencyNaval Research Logistics Quarterly, 1977
- Determining Optimum Reject Allowances for Multistage Job-Lot ManufacturingA I I E Transactions, 1970