Chance-Constrained Programming

Abstract
A new conceptual and analytical vehicle for problems of temporal planning under uncertainty, involving determination of optimal (sequential) stochastic decision rules is defined and illustrated by means of a typical industrial example. The paper presents a method of attack which splits the problem into two non-linear (or linear) programming parts, (i) determining optimal probability distributions, (ii) approximating the optimal distributions as closely as possible by decision rules of prescribed form.