OPTIMIZATION OF INTERMITTENT PUMPING SCHEDULES FOR AQUIFER REMEDIATION USING A GENETIC ALGORITHM1
- 1 December 2000
- journal article
- Published by Wiley in Jawra Journal of the American Water Resources Association
- Vol. 36 (6), 1335-1348
- https://doi.org/10.1111/j.1752-1688.2000.tb05730.x
Abstract
No abstract availableKeywords
This publication has 25 references indexed in Scilit:
- Incorporating Auxiliary Geophysical Data into Ground‐Water Flow Parameter EstimationGroundwater, 1997
- GROUND WATER SOLUTE TRANSPORT, OPTIMAL REMEDIATION PLANNING, AND DECISION MAKING UNDER UNCERTAINTY1Jawra Journal of the American Water Resources Association, 1996
- Optimal control for groundwater remediation by differential dynamic programming with Quasi‐Newton ApproximationsWater Resources Research, 1993
- Simultaneous parameter estimation and contaminant source characterization for coupled groundwater flow and contaminant transport modellingJournal of Hydrology, 1992
- Coupled inverse problems in groundwater modeling: 1. Sensitivity analysis and parameter identificationWater Resources Research, 1990
- Monte Carlo analysis and Bayesian decision theory for assessing the effects of waste sites on groundwater, II: ApplicationsJournal of Contaminant Hydrology, 1989
- Removal of 1,4-dioxane from wastewaterJournal of Hazardous Materials, 1986
- A stochastic‐conceptual analysis of one‐dimensional groundwater flow in nonuniform homogeneous mediaWater Resources Research, 1975
- Cost of Pumping WaferaGroundwater, 1969
- Costs of Wells and PumpsaGroundwater, 1969