Abstract
PEP, an 18-GeV electron-positron colliding-beam storage ring facility at SLAC, is being built by a team from LBL and SLAC. Construction is under way and completion is scheduled for Fall of 1979. This report summarizes the design of the facility and reports on the status of the project.

This publication has 5 references indexed in Scilit: